In this write-up I will explain the regular fundamental needs of a sound, contemporary high stress, straight installment. The adhering to description associates to a modern-day high pressure (400/600Kpa) system typically made by Kwikot South Africa.

geyser installationgeyser installation


Much less common are old reduced pressure systems (100kpa) open pipe or "Latco" kind systems. Know that the parts are NOT compatible in between the 2 distinctive systems - High pressure and Low stress! It is feasible to eliminate an old reduced stress system and also change it with a contemporary high pressure system nonetheless - you get a brand-new high stress hot spring as well as install it according to the existing spec.



The geyser rests in a tray made of plastic (frequently red) or tin plate. I favor the plastic ones.

Given that June 2001, the drip tray is not optional - its obtained to be there and also there has to be a drain pipe for it! The drainpipe is a 50mm PVC waste pipe that drains the tray by piping the water out the house (geyser installation).

Everything about Geyser Installation

The 2 vacuum breakers stand up and down about 30cm above the geyser. These are crucial, as they stop water siphoning out the geyser when the cool supply is quit - geyser installation.

Bear in mind that vacuum breakers are a fairly new demand - there are still thousands of old HP systems out there without vacuum breakers and I am yet to see one collapse. Simply due to the fact that I have not seen it doesn't suggest it's not taking place!

The chilly water side is the side that straight connects to the drainpipe penis and also enters the geyser at the bottom. After the shut off shutoff you would typically discover a Pressure Control Shutoff (PCV). There are a number of different kinds, mainly made of brass however some are made of plastic.

This is where the PCV launches pressure and this is the pipeline that commonly drips. Do not stress if you can not find the PCV next to the hot spring - it may be totaled 10 metres away, commonly in a more available position on a wall outside. Occasionally it remains in a little plastic box outside.

The smart Trick of Geyser Installation That Nobody is Discussing

This shutoff must have a steel (copper or steel) pipeline attached to it and also the pipeline need to lead straight out the structure. This vent pipeline is a crucial security attribute of the entire system.

The T&P shutoff is the least optional part - it additional resources has to exist! - The weight of the hot spring should be effectively supported on the roofing system trusses - a minimum of 2 assistances under the 'feet' of the geyser. If it looks unstable obtain a plumbing professional to examine it out.

The hot spring has to be earthed! I have actually seen many hot springs with the planet cable inapplicable. All the copper pipes have to likewise be earthed and adhered to the geyser earth.


Again, these are frequently simply left lying following to the geyser. There are basically only 2 key thermostat kinds - the contemporary round "Kwiktherm" in newer Kwikot geysers and also the VK (rectangle-shaped block) enter older geysers and also in some newer non-Kwikot units. The geyser might be fed (cold water) with polcop (plastic) pipe - as much as the turned off valve, however the pipe right into and out of the geyser must be copper or galvanized steel.

The Ultimate Guide To Geyser Installation

geyser installationgeyser installation


The hot water side need to be copper, steel or suitably ranked (70) plastic or composite pipe. Keep in mind that you must contend the very least 1m of copper/steel pipe out the geyser - you may not connect plastic (compound) pipeline directly to the geyser. As above, the PCV and T&P have to be have a peek at this website constructed from copper or steel - specifically the vent out of the T&P valve.

geyser installationgeyser installation


I have seen a number of setups where the installer has simply run a brief length of 22mm copper into the drip tray with the idea being that the T&P can air vent straight right into the drip tray. A suggestion since the hot (100 +) hop over to these guys water/steam melts the drip tray and the PVC drainpipe pipe.

The PCV is commonly over the hot spring and the chilly water streams down right into the hot spring. This is quite essential because it develops an anti-syphon loop that stops the geyser from draining pipes back through the inlet in the event of a water supply failure. If you fume water appearing your chilly taps when the water system fails then this is not functioning appropriately.